ROGTEC Magazine - Russian Oil & Gas Technologies - News, Reviews & Articles

  • swagelok
ROGTEC Magazine - Russian Oil & Gas Technologies - News, Reviews & Articles

Steel cutting ceremony Polarcus 14 streamer vessel NB292

Wednesday, February 9th, 2011

Polarcus Limited (OAX: PLCS) is pleased to announce that the official steel cutting ceremony of newbuild NB292 took place on 07 February 2011.
Vessel NB292 is the first of two newbuilds ordered from Ulstein Verft AS of Norway and announced by Polarcus on 18 November 2010. The vessels are being built to the ULSTEIN SX134 design but with a higher ice class (“ICE 1A super”), increased propulsion and other innovative efficiency enhancing features. Once delivered, these two high-end 3D seismic vessels will be capable of towing up to 14 solid streamers with 100m lateral separation between streamers.
Delivery of vessel NB292 is scheduled for March 2012.



Sponsored Adverts








rogtec
Tel: +350 2162 4000    Fax:+350 2162 4001
ROGTEC Magazine © 2009/2012 - All rights Reserved | Legal Disclaimer
Website design and development by Saul Haslam and Tictac Studio - SEO by Solar Internet Specialists in SEO Spain
[Valid RSS] Valid XHTML 1.0 Transitional ROGTEC Magazine in Twitter ROGTEC Magazine in LinkedIn ROGTEC Magazine Feed
ROGTEC Magazine in englishROGTEC Magazine in russian