Eurasia Journal News
  • SD UK

  • Gazprom Neft Builds First Production Well at the Tazovskoye Field, Yamalo-Nenetsk Autonomous Okrug

    Gazprom Neft subsidiary Gazpromneft-Razvitiye has completed construction of the first production well since obtaining its licence for the Tazovskoye field. The total length of the new high-tech well runs to 3.9 kilometres, 1.9 kilometres of this comprising the horizontal section.

    Initial production at the well is in excess of 100 tonnes per day. Data obtained as a result of drilling has allowed the geological model for the Tazovsky field to be clarified, and the development strategy for this asset adjusted — specifically in reducing the timeframe for developing the field, and in increasing potential hydrocarbon production.

    In its capacity as operator for field development Gazprom Neft re-tested two wells at the Tazovskoye field in 2017.

    Denis Sugaipov, CEO, Gazpromneft-Razvitiye and Head of Gazprom Neft’s Major Projects Directorate, commented: “Gazprom Neft is continuing its proactive development of a new production cluster in a key region for the company — the Yamalo-Nenetsk Autonomous Okrug. The development of oil-leg reservoirs in the Tazovsky and Achimovsky strata at the Severo-Samburgsky block (the licence for which the company acquired from Gazprom in 2017) is of dual significance for us: in utilising cutting-edge production technologies we can make sure Yamal’s precious natural resources are utilised as efficiently as possible, while, moreover, gaining valuable experience in working with hard-to-recover reserves.”

    source

    Previous post

    Weatherford: Launches New ForeSite Production Optimization Platform Release

    Next post

    Vladimir Putin Offers Congratulations on Gazprom’s 25th Anniversary