Eurasia Journal News
  • SD UK

  • KMG EP: Well Tests Show Positive Results at S. Nurzhanov, Liman and Akkuduk

    JSC KazMunaiGas Exploration Production announces the results of exploration activities at the north-eastern flank of S. Nurzhanov field, Liman and Akkuduk blocks.

    While testing the productive Triassic reservoir of the directional well drilled in 2015 at the   north-eastern flank of S. Nurzhanov field, the well flowed at a rate of 130 tonnes per day (about   900 bopd) of light crude oil on a 7 mm choke. Following Triassic the testing works will continue   at Jurassic and Cretaceous reservoirs. Preliminarily prospective resources are estimated at 3.9 mln tonnes of recoverable hydrocarbons. In 2016-2017 the Company plans to drill two appraisal wells to identify new deposits, estimate reserves and prepare for the trial production. The  company plans to start trial production in 2018.

    The new deposit at the north-eastern flank of S. Nurzhanov field is separated from the main producing S.Nurzhanov field by the fault system ranging 180 m and more. S. Nurzhanov field, one of the main fields of JSC “Embamunaigas” (EMG), is in production since 1963, accounting   for 17% of EMG production and 16% of 2P reserves.

    At Liman block while testing the subsalt Permotriassic reservoir of the exploration well PR-3 a natural oil flow rate of 3.3 cubic meters per day (20 bopd) was obtained. The Company plans to drill four exploration wells in 2016, make preliminary reserves estimate and prepare for the trial production. Trial production is expected in 2017-18 from the subsalt layers at Liman block.

    While performing testing, the exploration well at the new area adjacent to the producing Akkuduk field flowed at a rate of up to 18 cubic meters per day (110 bopd), and, as a result the new deposit in Middle Jurassic horizons was discovered. The Company plans to drill two   appraisal wells in 2016-2017 and start commercial production of the new area of the field after completing the approval of the reserves estimates and field development plan.

    Previous post

    Alexey Miller: Re-Elected for 5 More Years

    Next post

    Tatneft: Establishes Drilling Operations Control Center