RDCR 2018 – Delegate List & Agenda
The RDCR 2018 has the more operator presentations (14!) and more delegates registered with a week to go (340) than in any previous year. As the organizing company, we strive to improve the forum every year and the increase in both operator content and delegate numbers is a credit to the organizing committee, advisory board and everyone who supports the RDCR. Have you secured your attendance?
Are you interested in which operators are presenting and who is attending? Please click here for the agenda or here for the delegate list
EDC Group Confirm Silver Sponsorship
The organisers are pleased announce that Russia’s largest drilling company, EDC Group, have become Silver sponsors to 6th RDCR. As long time supporters of the forum we are proud to now count them as a key event sponsor.
Presentations
Rosneft: Managed Pressure Drilling as a Solution for Fractured Reservoirs in Eastern Siberia
RN Uvatneftegaz: Batch Drilling – Advantages, Cost Savings and Limitations Dmitry Kustaryov, Deputy Head of Drilling Technology and Engineering Department
Phoenix TSR: The Stream Auto Digger an Electronic Auto Driller System with EDR and SiteWatch (Online Monitoring System)
BashNIPIneft: Drilling Fluids for Unstable Formations
Salym Petroleum Development B.V: Reducing Drilling Waste with Pitless Drilling
MOL Group: Baytuganskoye Field: Minimising Well Construction Times and Costs in Small Diameter Wells
Salym Petroleum Development B.V: Increasing Well Integrity Through Cement Isolation
Tatneft: Application of lightweight cement plugs to PJSC Tatneft
PSK Burtechnologii: Experience of Using Lightweight Backfill Composition Super-K when Cementing Production Columns at the Lukoil-Komi Field: Optimization and Alternatives
Gazpromneft-Yamal: Experience and Prospects of TAML Multilateral Completions at the Novoportovskoye Field
Messoyakhaneftegaz: TAML Completions at the East Messoyakhskoye Field
Tatneft: TatNIPIneft: Experience of Constructing Multilateral Wells using a Retrievable Whipstock
RN-Purneftegaz: Well Construction Using Combined Columns
DrawWorks LP: A New Generation of Casing Running and Drilling Tools
Akvatik: Light-alloy Drill Pipe. Small Sidetrack Solution
SSC: Predicting and Preventing Fatigue Failure in Drill Pipes
Hardbanding Solutions: Inspection and Reapplication of Duraband NC Hardbanding for Continued Protection of Drill Pipe Tool Joints and Casing
TMK: TMK UP Centum: Reasons for 100% Efficiency Connection Application
Tatburneft: Electric Drive Control Systems for Active Bit Control
MTU: Batteries, Electrification, New and Tighter Emissions Regulations What’s in for the Future of the Global and Russian Oil & Gas Industry?
Caterpillar: Drill Rig Power Supply and Gas Genset High Variable Load Applications
Nabors Drilling: Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures
ABB: Innovative ABB Products and Solutions for Drilling
PAO Varyoganneftegaz: Results and Development Prospects for Acid Stimulation Technologies at PAO Varyoganneftegaz
NOV Completion Tools: Full-bore ID FRAC Sleeves Case History. Increasing Injection Rate During Selective FARC
Rosneft: Development and Implementation of the Hydraulic Fracturing Simulator RN-GRID
NOV Completion Tools: MSFRAC Well Completion Optimisation as a Way to Reduce Well Construction Time
LUKOIL-Nizhnevolzhskneft: TAML 5 Bilateral Well Construction at the V. Filanovsky Field
BP: Exploration and Appraisal Well Testing – Changes Needed in Tighter Rock
For further information on limited sponsorship options, or how to attend as a delegate, please contact Doug Robson by email atdoug.robson@rogtecmagazine.com or by phone at +34 951 388 667






