Uncategorized
  • SD UK

  • Ruspetro Spuds Second Horizontal

    Ruspetro plc is pleased to announce that it has spudded its second horizontal well (number 251) from Pad 23b having completed drilling of the horizontal section of the first well, number 214.  Production from well 251 is expected in August 2014. Well 214 is currently being completed with first production expected in July, as planned.

    Previous post

    Shelton Petroleum AB: Board of Directors Recommends Not to Accept Petrogrand’s Offer

    Next post

    Max Petroleum: Zhana Makat Well Strikes Oil and Zhanros Drilling On The Move