Oil & Gas Operators

RussNeft: Resumes Production Drilling at Variogan Oil Block

PJSC “RussNeft” resumes production drilling at Variogan oil block. By the end of 2020 the company plans to put into operation 5 oil wells at Achimov deposits of Tagrinskoye field and 4 wells are after side-tracking.

Production drilling at Variogan oil block was suspended in connection with production restrictions under OPEC+ deal.

It is also reported that  PJSC “RussNeft” plans to put into operation 24 new wells and 12 wells after side-tracking. Implementation of these activities will secure the Company’s output increase in the amount of 195 923 k tons.

RussNeft concludes that these steps will allow to flatten out the levels of production at the Block in 2020 and solid growth of production indicators in 2021.

source

Previous post

Wood Extends Training Contract with 3t Energy Group by Three Years

Next post

Iraq’s Prime Minister and LUKOIL Head Discussed Prospects of Cooperation