Eurasia Journal News

Gazprom Neft: Establishes a New Production Centre in the North of the Yamalo-Nenets Autonomous Okrug

Gazprom Neft has commissioned oil production infrastructure at its Pestsovoye and En-Yakhinskoye fields in the Yamalo-Nenets Autonomous Okrug. Production volumes here expected to exceed 6.3 million tonnes of oil equivalent (mtoe) as early as next year. Oil-rim deposits at these two fields from part of the company’s new oil production centre in the Arctic. A central gathering plant has been …

READ MORE →
Eurasia Journal News

New Record for Daily Drilling Meterage

A new drilling record has been set at the Yamalo-Nenets field. The well with a horizontal borehole 1197 meters long was drilled in 28.74 days. On average, drillers spent 5.88 days for every 1,000 meters of drilling, with a total footage of 4884 meters. Previously, the best indicator for wells of a similar …

READ MORE →