Eurasia Journal News

LUKOIL Proceeds with Filanovsky Field Phase Two Development

Deputy Prime Minister of the Russian Federation Yury Borisov and President of LUKOIL Vagit Alekperov launched phase two of the development drilling campaign of the Offshore Ice-Resistant Fixed Complex 2 (OIRFC 2) at Vladimir Filanovsky field in Astrakhan, Russia, today. The second phase aims to keep oil production at the …

READ MORE →
Eurasia Journal News

LUKOIL Supplies 10 Million Tonnes of Oil from Filanovsky Field to CPC System

LUKOIL has reached another milestone with ten million tonnes of oil supplied from its Vladimir Filanovsky field to the Caspian Pipeline Consortium (CPC) system. LUKOIL constructed a system of subsea and onshore pipelines to ship oil ashore. Before oil enters the CPC system and goes on for export, it is delivered …

READ MORE →
Eurasia Journal News

LUKOIL Commissions Third Well at Filanovsky Field Second Stage

LUKOIL completed the construction and commissioned the third well at the second development stage of the Vladimir Filanovsky field in the Caspian Sea. This is a bilateral horizontal oil producing well. The length of the main wellbore is 3,795 meters while the lateral is 3,762 meters long. Well’s initial flow rate exceeded 3.2 thousand tonnes of …

READ MORE →
Eurasia Journal News

LUKOIL Starts Drilling of the First Production Well at the Phase 2 of the Filanovsky Field

LUKOIL finished most of the construction works at Vladimir Filanovsky field’s Phase 2 development facilities and started drilling of the first production well. The drilling is planned to be completed in early 2018.  The Phase 2 facilities will allow to reach the stable designed production plateau of 6 million tons …

READ MORE →
Eurasia Journal News

LUKOIL: Completes Fifth Vladimir Filanovsky Well and Commences New Injection Well

LUKOIL has completed the construction and commissioning of the fifth production well at Vladimir Filanovsky offshore field in the Caspian Sea and commenced the construction of the sixth well that is going to be used for water injection. The fifth well has a bilateral horizontal design. The horizontal length of …

READ MORE →
Eurasia Journal News

Lukoil: Starts Commercial Production from the Vladimir Filanovsky Field

Lukoil started commercial production at the Vladimir Filanovsky field in the Caspian Sea was launched today by the President of the Russian Federation Vladimir Putin. The Vladimir Filanovsky field, discovered by LUKOIL in 2005, is Russia’s largest oil discovery for the past twenty-five years and the second field commissioned by …

READ MORE →
Eurasia Journal News

LUKOIL: Spuds First Development Well at the Vladimir Filanovsky Field

Today President of PJSC LUKOIL Vagit Alekperov and Governor of the Astrakhan Region Alexander Zhilkin visited Vladimir Filanovsky field in the Caspian Sea where development drilling has just begun. The well is being drilled from an ice-resistant fixed platform (LSP-1). First commercial production at the field is scheduled for the …

READ MORE →