
“Gazprom Dobycha Noyabrsk” Commissioned New Wells At The Chayandinskoye Field
At the Chayandinskoye oil, gas and condensate field seven new gas wells in the area of Gas Pre-Treatment Unit No. 4 have been connected to the installation and put into operation. They operate stably, in accordance with the established technological regimes. All active gas well pads at the field are …

The Vyngayakhinsky Gas Field of the Gazprom Dobycha Noyabrsk Company is 20 Years Old
The Vyngayakhinsky gas field of the Gazprom dobycha Noyabrsk company is 20 years old On October 25, 2003, gas supply to the pipeline from the Vyngayakhinsky gas field began. The volume of accumulated production since the start of operation is more than 91 billion cubic meters of gas. The Vyngayakhinsky …
Vladimir Kobychev Became the New Head of Gazprom Dobycha Noyabrsk
He worked in the structures of Gazprom for 22 years Vladimir Kobychev, who had worked in Gazprom’s structures for 22 years, was elected General Director of Gazprom Dobycha Noyabrsk. It is reported by “Gazprom”. From 2018 to 2023, he held the position of Deputy General Director for the production and …

Rescuers of the Chayandinskoye Oil and Gas Production Department of Gazprom Dobycha Noyabrsk Confirmed Their Qualifications
On August 14–15, at the Chayandinskoye field, the non-standard emergency rescue team of the Chayandinsk Oil and Gas Production Administration (NASF ChNGPU) was certified. In the course of special tactical exercises, actions were worked out to bring the formation to readiness and search and rescue the victims. They were held …

New Domestic Equipment Installed at the Chayandinskoye Field
A variable frequency drive (VFD) for high-voltage motors of the compressor unit of the booster compressor station (BCS) was installed at the Helium Concentrate Membrane Recovery Unit at the Chayandinskoye Oil and Gas Production Department of Gazprom Dobycha Noyabrsk LLC. This domestic equipment was manufactured in Cheboksary. It is designed …

Anton Dzhalyabov Put in Charge of Gazprom Dobycha Noyabrsk
Anton Dzhalyabov has been appointed Director General of Gazprom Dobycha Noyabrsk. Anton Dzhalyabov was born in 1980. He graduated from Ufa State Petroleum Technological University, majoring in Oil and Gas Field Development and Operation. He has been employed with Gazprom for 19 years. Between 2002 and 2020, he rose through the ranks from Oil and Gas Production …
TMK: Ships Premium Tubular Products for Gazprom Dobycha Noyabrsk’s Chayandinskoye Field
TMK, one of the world’s leading producers of tubular products for the oil and gas industry, has shipped a large batch of premium threaded connection pipe to Gazprom Dobycha Noyabrsk. The shipment comprised casing pipe with TMK GF and TMK FMC threaded connections, as well as tubing pipe with TMK …
TMK: Wins 1.5bn Rub Contracts From Gazprom
TMK, one of the world’s leading producers of pipes for the oil and gas industry, took part in Gazprom tenders for premium tubular products. Following two public requests for proposals, TMK was announced the winning bidder in 8 out of 13 lots. In 3Q and 4Q 2015 TMK will supply …
Gazprom Dobycha Noyabrsk: Igor Krutikov Appointed General Director
Igor Krutikov was named Director General of Gazprom Dobycha Noyabrsk. He was born in 1964 in the Sakhalin Region. In 1986 he graduated from Siberian Order of the Red Banner of Labor Automobile and Road Technical Institute, in 2008 he obtained an MBA degree from St. Petersburg International Management Institute. …