Eurasia Journal News

Gazprom International Discovered a New Gas Field in Bangladesh

Gazprom International has discovered a new Illisha-1 gas field in Bangladesh, the company said. “Well tests conducted on May 14-20 at the Illisha-1 gas well on the island of Bhola in Bangladesh demonstrated a commercial gas inflow with a flow rate of 19.6 million cubic feet (554 thousand cubic meters) …

READ MORE →
Eurasia Journal News

Gazprom International: The Practical Experience Of Using Machine Learning Algorithms To Optimize Well Construction Timing by Renat Dzhafarov

The presentation made by Renat Dzhafarov, Specialist of Drilling Division, Gazprom International at the 1st Combined RDCR&KDR Virtual Well Engineering Forum on the 4th of Dec 2020 is available below. The presentation discussed the “Role of machine learning in reduction of both non-productive time (NPT) and invisible lost time (ILT). …

READ MORE →
Uncategorized

ERIELL Group Successfully Completed Drilling of Dour Wells in the Republic of Bangladesh Under the Contract with Gazprom International

ERIELL Group completed drilling of 4 directional wells of 3,532 — 3,880 meters in depth at Titas field in the Republic of Bangladesh under the contract with Gazprom International. The wells were constructed using the drilling rig ZJ-70 LDВ-450. Titas is not the only project of ERIELL in Bangladesh. Wells Shrikahil-3 (3,350m), Bekumgandzh (3,565m) and Semutang (3,032) have been drilled to date. In progress …

READ MORE →