Verkhnechonskoye: Reducing Horizontal Well Construction Times
The construction time of a horizontal well at the Verkhnechonskoye oil and gas condensate field has been significantly reduced thanks to drilling a 178-mm production casing interval in a single run using the QuadCombo logging suite. The Verkhnechonskoye field keeps embracing optimization of well drilling and construction. To date, the …