ERIELL Starts Drilling Operations in Iraq
ERIELL, an international oilfield service group, has signed a contract with LUKOIL Middle East for drilling of 25 producing wells at the West Qurna-2 field in Iraq. “Company’s entry to the Iraq market marks the beginning of development of the Middle East region, which we deem extremely promising in terms …
Gazprom Neft Begins Commercial Production and Oil Deliveries From the Badra Field in Iraq
Gazprom Neft, the operator of the Badra oil field in Iraq, announces that first oil from the field is now being delivered to Iraq’s main pipeline system for transfer to the export terminal in Basra (Persian Gulf). Current deliveries from Badra to the pipeline stand at over 15,000 barrels of …
Lukoil Ships First Batch of Compensation Oil as Part of West Qurna-2 Project in Iraq
Sea Triumph, a tanker chartered by LITASCO (an international marketing subsidiary of OAO LUKOIL), left the port of Basra in southern Iraq with a load of crude. This is the first batch of oil in reimbursement of the costs incurred by LUKOIL as part of the West Qurna-2 project. The …
Gazprom Neft Begins Exploratory Drilling in Kurdistan
Gazprom Neft has begun drilling an exploration well at the Shakal block in Kurdistan (Iraq) and is soon to commence drilling on a second exploration well. The project will study two oil reservoirs in the Shakal block including flow testing. Well testing will be completed by late 2014 / early …
Gazprom Neft: Deliveries Begin to Oil Reservoirs at the Badra Oil Field in Iraq
Gazprom Neft, the operator of the Badra oil field in Iraq, announces that deliveries of crude oil have started from the field to reservoirs of the Central Gathering Point (CGP). Two wells are currently producing oil at the deposit. Over the coming month, once the reservoirs have been filled, oil …
Lukoil Board of Directors Summarizes Company Preliminary Performance in 2013 and Sets Priorities for 2014
LUKOIL’s Board of Directors held a meeting in Moscow today to summarize the company’s preliminary performance results from 2013 and set priorities for 2014. The geologic exploration results prove that an increment of the recoverable hydrocarbon reserves in the amount of 130.2 million tons of reference fuel (93.5 million tons of liquid hydrocarbons and …
Gazprom Neft produces first oil at Badra oilfield, Iraq
Gazprom Neft, operator of the Badra oilfield, Iraq, has reported the successful completion of well-testing at its BD4 appraisal well at the end of December, 2013. Potential production capacity was tested through the sequential testing of six drilled strata, followed by final testing of all pay horizons concurrently. A daily natural flow rate of 7,000 barrels of oil was recorded. Testing …
Gazprom Neft’s Shakal block in Iraq sets seismic survey world record
A new world seismic surveying record has been set on the Gazprom Neft operated Shakal block in Iraq. During the seismic study, data was transmitted from more than 6,200 sensors using RT System 2 wireless recording. According to Wireless Seismic, Inc., which manufactured the equipment, this is the greatest number of …
Rosneft President Discusses Bilateral Cooperation With Prime Minister of Iraq
On April 16 Igor Sechin, Rosneft President, Chairman of the Management Board and Sergey Chemezov, Rostec State Corporation Director General held talks with the Iraqi Prime Minister Nouri al-Maliki as part of a working visit to Iraq. During the talks Rosneft offered to conduct technical audit of facilities in operation …
Gazprom Neft begins well tests at Badra oil field in Iraq
Gazprom Neft, the operator of the Badra oil field in Iraq, has begun testing well Bd4. After completion of the first stage of experimental work, the well began gushing at a flow rate of 2000 barrels of oil per day. A total of seven tests are scheduled at the site, …