
SPD: Sets a New Drilling Record
In November, a new performance level was achieved for “days per 1,000 meters drilled” indicator during construction of one of wells in the South Hub: 2.65 days / 1,000 m, while the target indicator for the current year is 3.85 days / 1,000 m. As a result, a horizontal well was drilled in …