
A Software Solution for Automatic Optimization of Logistics During Well Drilling and Flowback Operations
Optimizing logistics during drilling and the development of wells, consists of building an optimal schedule for all the labour resources. Optimized scheduling makes it possible to significantly reduce the time and costs associated with geological and technological risks. The article describes the functionality of our software solution and presents the …

NNTC Research & Development Center: Integrated LWD, Mud Logging and Geomechanical Surveys While Drilling in the Nizhnevartovsk District
This article presents the study of an integrated approach to drilling process management with the aim to optimize and reduce well construction time. It demonstrates successful integration of well construction design and technology aspects. The described experience is unique for Russian companies and based mostly on Russian techniques. Introduction Nowadays …