Eurasia Journal News

Petrosibir: Drilling update – Bashkiria

As planned the second exploration well on the Orlinskaya structure within the Suyanovskoye licence was spudded in mid-January. The drilling is now completed with the well reaching the total depth of 2,422 meters which was deeper than the initial target depth of 2,362 meters. The Orlinskaya-1 well targeted 4 intervals: …

READ MORE →
Eurasia Journal News

Petrosibir: Operational Summary 2018

As the end of 2018 is approaching Petrosibir would like to briefly summarize the efforts during the year. In the spring of 2018 the drilling campaign that commenced in 2017 was finalised in Komi with encouraging results. The campaign included drilling of six new wells and subsequent fraccing. The flow …

READ MORE →
Eurasia Journal News

Petrosibir: Orlovsky Test Prove High Reservoir Quality but Low Flow Rates

Petrosibir has previously announced that the drilling of well #9 has been completed and that testing started in October. The tests of the Orlovsky horizon has confirmed a high reservoir quality, however, at low flow rates. Certain measures are planned to improve the productivity. Petrosibir is also going to test …

READ MORE →