
On-the-Rig Simulator Improves Stuck Pipe Prevention Rates for SSK in Russia
Since opening its state-of-the-art simulator training facility in Nefteyugansk, the Siberian Service Company (SSK) has upskilled hundreds of personnel in drilling and well control operations and improved stuck pipe prevention rates. The new training centre was launched in October 2019 following SSK’s investment in the latest generation of On-the-Rig (OTR) …

SPD: Sets a New Drilling Record
In November, a new performance level was achieved for “days per 1,000 meters drilled” indicator during construction of one of wells in the South Hub: 2.65 days / 1,000 m, while the target indicator for the current year is 3.85 days / 1,000 m. As a result, a horizontal well was drilled in …
SPD: Drills Record Salym Production Well
SPD set a new record drilling a 4288-meter long production well. It is the longest production well ever drilled in Salym group of oil fields. A drilling milestone was delivered on pad 56 in Vadelyp field by the drilling rig 7 of Siberian Service Company (SSK), SPD drilling contractor. “This …