Uncategorized

IATA Upgrades Quality Control System and Service Level Ratings of Koltsovo Fuel Filling Complex

TNK-BP announces that International Air Transport Association (IATA) has upgraded its quality control system and service level ratings for Koltsovo Fuel Filling Complex (Yekaterinburg).   Since the acquisition of Koltsovo Fuel Filling Complex, Russia’s fifth largest fuel filling complex, in March this year, TNK-BP has been implementing an integrated FFC …

READ MORE →
Uncategorized

ТNК-ВР Invests Over $80 million into Yamal Oil Pipeline System in 2011 and 2012

ТNК-ВР is completing the front-end phase of its Yamal Oil Pipeline Project, in which the company has invested more than $80 million in 2011 and 2012. The money was used to fund conceptual design, front-end engineering and the early construction operations on the pipeline and associated infrastructure. The 374-kilometer Yamal …

READ MORE →
Uncategorized

Drilling the Distance: Baker Hughes’ AutoTrak Curve Rotary Steerable Systems Drill Two Million Feet, Saves Time

The Baker Hughes AutoTrak™ Curve rotary steerable system has drilled more than two million feet in unconventional shale plays in only 18 months since the first test wells and six months since the system’s official commercial launch.   The convincing pick-up in footage drilled per month indicates the value this …

READ MORE →
Uncategorized

TNK-BP Invites Partners to Take Part in Construction of Oil Pipeline System in Yamal

Rospan International (a member of the TNK-BP Group of Companies) is planning to announce a tender for the construction of the “Yamal” oil pipeline system, with a total length of around 374 km, to enable transportation of oil from fields in Yamal-Nenets Autonomous District and northern Krasnoyarsk Kray. The project …

READ MORE →