Salym Petroleum Development: West Salym and Vadelyp Fields Could Be Connected
Salym Petroleum Development N.V. (SPD) has successfully drilled an exploration well at the interface between West Salym and Vadelyp fields. The well suggests that both fields could be connected, resulting in a significant increase in expected hydrocarbon reserves. ‘Successful exploration drilling is a result of meticulous work performed by our …
SPD: Drills Record Salym Production Well
SPD set a new record drilling a 4288-meter long production well. It is the longest production well ever drilled in Salym group of oil fields. A drilling milestone was delivered on pad 56 in Vadelyp field by the drilling rig 7 of Siberian Service Company (SSK), SPD drilling contractor. “This …